NEXUS BETWEEN VENDOR SELECTION AND PROJECT DELIVERY TIME IN EKO ELECTRICITY COMPANY
DOI:
https://doi.org/10.57233/gujeds.v5i1.29Keywords:
vendor performance, lead time, defect rate, project delivery timeAbstract
Studies have shown that vendor selection is key in project delivery time. This study, therefore, examined the relationship between vendor selection and project delivery time, with empirical evidence from Eko electricity distribution Companies in Lagos, Nigeria. The study adopted a survey research design with a sample size of one hundred and twenty-eight (128) members of staff which consisted of project managers, operation managers, and supervisors. The study adopted double sampling techniques comprised of convenience and judgmental samplings. Descriptive and inferential statistics were engaged. For descriptive statistic, mean and standard deviation were adopted, while multiple regression technique with the aid of SPSS version 21 was used to analyse the formulated hypothesis. The findings of this research revealed that there is a strong positive relationship between vendor selection and project delivery time among staff members of Eko Electricity distribution companies (r2 =0.640). rigorous vendor evaluation processes should be carried out that will help in selecting vendors that are capable of delivering high-quality services within stipulated timelines. However, utilizing advanced management software to streamline the vendor selection process, monitoring performance, and maintaining real-time communication should help enhance transparency, improve decision-making, and promoting efficient management of vendor- related activities.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Author(s)

This work is licensed under a Creative Commons Attribution 4.0 International License.